PROJECTS COMPLETED
|
PROJECT ADDRESS |
PROJECT DESCRIPTION |
OWNER’S NAME & PHONE NO. |
ALAMEDA |
|
|
|
2005 Central Ave. (2011) |
Soft Story Seismic Retrofit Design/build of three 11 units Apartments each 3 story Building |
Dr. Paul Anders
|
| 2115 Santa Clara Ave. (2011) |
Soft Story Seismic Ordinance Design/build 10 units Apartments 2 story Building |
Judy Wong |
|
1233 Santa Clara Ave. |
Soft Story Seismic Ordinance Design/build 30 uints 3 story condominium Building |
The SPA HOA |
| 1525 Schiller Street (2011) |
Soft Story Seismic Ordinance Design/build 14 units Apartments 3 story Building |
Shaffer Properties |
| 537 Pacific Ave. (2011) |
Soft Story Seismic Ordinance Design/build 6 units Apartments 2 story Building | Tony Eng (510) 522-2508 |
| 2217 Otis Drive (2011) |
Soft Story Seismic Ordinance Design/build 17 units Apartments 3 story Building | Harbor Bay Realty Property Management (510) 814-4804 |
| 729 Central Ave. (2011) |
Soft Story Seismic Ordinance Design/build 18 units Apartments 4 story Building | Don Lindsey (510) 520 3453 |
| 2136 Santa Clara Ave. (2011) |
Soft Story Seismic Ordinance Design/build 10 units Apartments 3 story Building | Mr. & Mrs. Soulages (510) 521-335 |
| 2144 Lincoln Ave. (2011) |
Soft Story Seismic Ordinance Design/build 18 units Apartments 3 story Building | Mr. & Mrs. John Fleming (415) 731-5684 |
| 916 Union St. (2011) |
Soft Story Seismic Ordinance Design/build 37 units Apartments 4 story Building | Don Lindsey (510) 520 3453 |
| 2208 San Antonio Ave. (2010) |
Soft Story Seismic Ordinance Design/build 10 units Apartments 3 story building | Sam Dughman (510) 205-1862 |
| 2211 San Antonio Ave. (2010) |
Soft Story Seismic Ordinance Design/build 10 units Apartments 3 story building | Patricia Fredricks (925) 371-2612 |
| 508 Lincoln Ave. (2010) |
Soft Story Seismic Ordinance Design/build 12 units Apartments 4 story building | William Sheehan (510) 522-0978 |
| 1419 Grand St. (2010) Mediterranean Apartments |
Soft Story Seismic Ordinance Design/build 32 units Apartments 4 story Building | Gallagher & Lindsey (510) 520 3453 |
| 510 Lincoln Ave. (2010) |
Soft Story Seismic Ordinance Design/build 12 units Apartments 4 story building | William Sheehan (510) 522-0978 |
| 1607 Santa Clara Ave. (2010) |
Soft Story Seismic Rehab Design/build 2 units Apartments 2 story Building | Don Muzio (510) 521- 9026 |
| 1242 Regent St. (2010) |
Soft Story Seismic Ordinance Design/build 6 units Apartments 2 story Building | Shafer Properties (510) 220-7074 |
| 627 Lincoln Ave. (2010) |
Soft Story Seismic Ordinance Design/build 18 units Apartments 4 story Building | William Sheehan (510) 522-0978 |
| 743 Santa Clara Ave. (2010) |
Soft Story Seismic Ordinance Design/Build construction of 4-story 12 units apartment building. 3 new steel moment frames, and 225 linear feet of new shear walls. |
William Sheehan (510) 541-6082 |
| 530 Santa Clara Ave. (2010) |
Soft Story Seismic Ordinance Design/Build construction of 4-story 12 units apartment building. 4 new steel moment frames, and 225 linear feet of new shear walls. |
Don Lindsey Gallagher & Lindsey (510) 520-3453 |
| Driftwood Apartments 2101 2127 Otis 610-624 Willow (2009) |
Soft Story Seismic Ordinance Design/Build construction of large apartment complex 67 units. Installed 13 new steel moment frames, and 17 new wood shear walls. | Driftwood Apartments c/o Erik Johnson (510) 835-4708 |
| US Grant Apartments 736 Lincoln Ave. (2009) |
Soft Story Seismic Ordinance Design/Build construction of large 4 story 37 units apartment complex. 10 new steel moment frames 4 new wood shear walls. | Don Lindsey Gallagher & Lindsey (510) 520-3453 |
| Lanai Apartment 2020-2028 Franciscan Way (2009) |
Soft Story Seismic Ordinance Design/Build construction of 52 units apartment complex. 4 new steel frames, perimeter & interior shear transfer hardware. | Lanai Apartments Erik Johnson (510) 835-4708 |
| Wavecrest Apartment 2000-2020 Franciscan Way (2009) |
Design/Build construction of 52 units apartment complex. 4 new steel frames, perimeter & interior shear transfer hardware. | Wavecrest Apartments Erik Johnson (510) 835-4708 |
|
Soft Story Seismic Ordinance Design/Build construction of 4 story 34 units apartment complex. 9 new steel frames, 2 new wood shear walls. |
John Ito |
|
|
Soft Story Seismic Ordinance Design/Build construction of 22 units – 3 story condominiums. Installed 3 new steel moment frames and several shear wall hardware. |
Grand Central Condominium |
|
|
1404 Park St. (2005)
|
Design/build 2 story commercial UMB seismic retrofit. |
Don Lindsey Gallagher & Lindsay (510) 520-3453 |
|
1820 Santa Clara St. (2003) |
Soft-Story Design/build 45 unit apartment complex seismic retrofit. |
Ron Dunn (510) 521-9721 |
BERKELEY |
|
|
|
2025 Shattuck Ave. |
Seismic retrofit & handicap improvements of 2 story Restaurant building. |
Mandarin Garden Rest. |
|
2101 San Pablo Ave. |
Seismic retrofit & handicap improvements of 1 story retail building. |
Country Cheese |
|
1775 Solano Ave. (2007) |
Design/build Seismic retrofit of large 1 story retail building. |
Richard Odenheimer (510) 450- 1414 |
|
2445-2451 San Pablo. |
Seismic retrofit and TI works of large 1 story plus mezzanine retail building. |
Ms. Rowena Kendall (707) 365-1136 |
|
1921 University Ave. (2005) |
Design/build 2 story commercial building/ restaurant seismic retrofit. |
Pauline Lam (510) 759-4201 |
|
2025 San Pablo (2003) |
Design/build 1 story commercial building seismic retrofit. |
Kelvin Tse (510) 712-0129 |
|
2566 Telegraph Ave. (2005) |
Design/build 2 story commercial building seismic retrofit. |
Edward Dhong (415) 576-3000 |
|
1521 San Pablo Ave. (2003) |
Design/build 1 story commercial building veneer tie down. |
Mr. & Mrs. Lee (510) 525-5129 |
|
2201 Dwight Way (2001) |
Design/build 1 story commercial building Parapet Brace. |
Ms. Catheryn Gordon (414) 550-0273 |
|
1941 University Ave. (2004) |
1 story commercial brick building seismic retrofit. |
Mr. Lun Lin (925) 837-6482 |
CASTRO VALLEY |
|
|
2644 Castro Valley Blvd.(2006) |
Design/build 1 story retail brick building seismic retrofit. |
Dinh Nguyen (510) 908-2455 |
CONCORD |
|
|
2051 Harrison St.(2007) |
Tenant improvements for 14,000 SF commercial building. |
Ken Defiebre KSD Group (925) 827-0841 |
FREMONT |
|
|
4461 Peralta Blvd.
|
Seismic Retrofit Design/build of 20,250 Sq. Feet retail-warehouse tilt-up building, per City of Fremont Tilt-up Ordinance. Wall anchors, seismic ties and sub-diaphragm ties designed & installed. |
Richard Castner |
HAYWARD |
|
|
|
913 B St. |
Design/build 2 story plus basement commercial brick Building seismic retrofit. |
Antonini & Associates (510) 881-4981 |
LAFAYETTE |
||
| 3695 Boyer Circle (2009) |
Two story single family home. Major foundation underpinning and sub-floor re-framing, rat proofing, perimeter French Drains, brick chimney brace. | Eugene Leong (415) 385-3184 |
LIVERMORE |
|
|
152 S. Livermore St.(2000) |
1 story commercial brick building seismic retrofit. |
Mr. Michael Lee (408) 655-6688 |
|
2551 2nd St. |
1 story commercial brick building seismic retrofit. |
Mr. Koolhoven (925) 373-6313 |
MILL VALLEY |
|
|
11 ThrockmortonEl Paseo Restaurant.(2005) |
2 story restaurant building seismic retrofit. |
Nancie Bottmeyer (415) 459- 1550 |
OAKLAND |
|
|
|
3833 Maybelle Ave. |
Voluntary Seismic soft story retrofit of 3-story apartment building | Ms. Edena Tsou (510) 928-1246 |
| 3240-46 Telegraph Ave. (2010) |
Seismic retrofit and major interior renovation of two plus mezzanine story mix use residential live work/retail building. Installed new roof, new steel moment frame and foundation, new wall to roof and floor anchors, ceiling and wall fire and sound proofing. | Link Corkery PCLC Inc. (510) 886-1212 |
|
2923 Adeline St. (2008) |
Design/build tenant improvements for large 1 story building into several units. |
Joe Hurwich (510) 654-9669 |
|
484-490 Lake Park. (2007) |
Design/build Seismic soft story improvement of on story building. |
Richard Odenheimer (510) 450- 1414 |
|
210 Hegenberger Loop. (2008) |
Design/Build Seismic retrofit of 30,000 sq. feet tilt-up building. |
Peter McNally (510) 207-6007 |
|
6050 Lowell St. (2003) |
Design/build 1 story retail tilt up seismic retrofit. |
Jack Manners (925) 254-0226 |
|
1078 60th St. (2006) |
Floor addition and Voluntary seismic retrofit |
Matthew Newman (510) 238-8522 |
|
407 Vernon St. (2003) |
Design/build 23 unit soft story residential apartments seismic retrofit. Installed several steel frames & foundations. |
Mr. Run Dunn (510) 915- 9721 |
|
P& C Pacific Bakeries 2923 Adeline St. (2000) |
Design/build 2 story commercial brick building seismic retrofit. |
Joe Hurwich (510) 834-3134 |
PALO ALTO |
|
|
315 E. O’keeffe St.(2007) |
Design/build Voluntary Seismic retrofit of 3 story Soft Story Apartment Building, constructing 8 steel moment resisting frames and foundations. |
Dominic Passanisi (650) 926-5270 |
PETALUMA |
|
|
137-139 Kentucky St.(2001) |
Design/build Parapet brace and brick re-pointing 1 story commercial. |
Vernon Jensen (707) 762-4554 |
POINT RICHMOND |
|
|
|
210 Washington St. (2005) |
Design/build Seismic Retrofit, façade preservation & Tenant improvements of three story commercial building. |
Kirk Wallis (510) 367-0500 |
SAN LEANDRO |
|
|
1746 Washington St.(2006) |
Design/build 1 story commercial UMB seismic retrofit. |
Stan Kahan(510) 841- 4228 |
SAN FRANCISCO |
|
|
| 890 Hayes St. Walden House |
Structural steel stairs replaced with new galvanised. Shop & field welding. 4 story building. Exterior paint and repair of rotten wood siding. Kitchen & cafeteria fully tiled. |
Danny Montgomery- Walden House Maintanance Manager(415) 517-3039
|
| 901 Balboa St. (2010) |
Complete exterior and interior renovation of two story two unit residential dwelling. New foundation, framing, electrical, mechanical, plumbing, windows, garage, roof | Paul Wong (415) 821-1281 |
| 2830 20th St. (2009) |
Seismic retrofit of two story unreinforced brick masonry building. Installed structural wall to floor hardware and new shotcrete wall on new foundation. | Brad Stedem By Palisades (310) 450-2200 |
|
First Church of Christ, Scientist |
Seismic rehabilitation of historic church building, over 22,000 square feet. New plywood roof, three new steel moment frames, 5 new shotcrete shear walls. Several wall to floor anchor systems. New toilets and numerous handicap upgrades. |
Sarah Blanchard, Secretary/Treasurer First Church of Christ Scientist (415) 673-3544 |
|
Walden House |
Seismic retrofit of the large 4 story concrete/brick building used for drug rehabilitation in conjunction with Mayor’s Office of Housing Seismic Safety Loan Program. » more... |
David Crawford, CFO Walden House ( 415) 355-8403 |
|
417 – 419 Hyde St. (2008) |
Major structural & Tenant improvements of a 4 story residential building. Including new electrical, mechanical, roofing system. |
Paul Wong (415) 279-0123 |
|
2728 Hyde St. (2007) + (2009) |
Installation of several tenant improvements features throughout the 3 story building. |
Ms. Rhonda Bennon Hyde Street LLC (415) 362-5000 |
|
Temple of Good Fortune & Wisdom |
Lift and move existing historic landmark building. Add new foundation and restore original Façade & interior. Complete construction & interior of new 4-story monastery building at the rear. 15,000 SF Project. |
Ms. Tammy Connors Temple of Good Fortune & Wisdom (503) 686-2692 |
|
Complete Structural renovation, TI works and new story addition of 3-story commercial / residential building. |
Mr. Shamieh(415) 333-6704 |
|
|
1500 Valencia St. Salvation Army Warehouse (2006) |
Repair of wood floors. Install new handicap ramp. Install new complete 3-story elevator system. |
Loren Umbertis Swinerton Management (415) 271-2486 |
|
83 Minna St. (2007) |
Seismic retrofit of 2-story Parking structure UMB Building . |
Jim Patrick (415) 392-2640 |
|
90 Natoma St. (2005) |
Seismic retrofit of 2-story restaurant UMB Building. |
Jim Patrick (415) 392-2640 |
|
4117-4121 18th St. (2006) |
Seismic retrofit of 2-story Night club/bar. |
Les Natali ( 626) 5017 |
|
512 2nd St. (2006) |
Installation of a new 4-story elevator system, mechanical room and fire stair lobby for existing building. |
Kal Ayoub (415) 546-1111 |
|
460 Bryant St. (2007)
|
Construction of two structural steel billboards above roof top, 50’ wide by 35’ high each. |
Bill Garlock Credit National De Geneve (415) 307 8107 |
|
642 Harrison St. (2007) |
Conversion of first floor of multi story building to parking. New floors, stairs, ramps, handicap restrooms. |
Tom Mckeithen (650) 283-2859 |
|
640 Sutter St. The Metropolitan Club (2008) |
Patching Concrete ceiling & leveling concrete floor of 7-story commercial building. |
Steve Walker The KSD Group (925) 827-0841 |
|
460 Bryant St. (2007) |
3 story plus basement major UMB seismic retrofit. |
Phil Clock Garlock & Company (650) 543- 3000 |
|
455 Minna St. (2006) |
1 story commercial UMB seismic retrofit. |
Ann Mosses (415) 641-6136 |
|
1074 Stockton St. |
3 story with basement First Republic Bank building major seismic retrofit and handicap installation. |
Norman Lew (415) 781-8251 |
|
Historic landmark Buddhist Temple, 14,000 S.F. Major seismic retrofit construction including steel frames, concrete shear walls .New roof, electrical, mechanical, restrooms, interior & facade work. Major renovations. » more... |
Ms. Tammy Connors Temple of Good Fortune & Wisdom (503) 686-2692 |
|
|
1659 Market St. (2007) |
2 story plus basement retail building seismic retrofit and handicap construction. |
Eddy Dudum (415) 621-3476 |
|
28 Belden place. Tiramisv Restaurant (2006) |
Seismic retrofit & kitchen improvements of restaurant. |
Dr. Ron Castellino (650) 823-1050 |
|
500 Second St. (2006) |
3 story plus basement commercial building major seismic retrofit and handicap construction. |
Mr. & Mrs. Bonnette (650) 323-6526 |
|
559 Clay St.
|
4 story plus basement historic landmark building UMB seismic retrofit & major modifications. New roof, floors, restrooms at each level, elevator, electrical, mechanical, sprinklers, HVAC & sidewalk. » more... |
Ms. Rhonda Bennon Clay/Commercial Co. (415) 362- 5000 |
|
41 Drumm St. |
Design/build 2 story plus basement commercial UMB seismic retrofit & major modifications. |
John Yee (415) 777-2828 |
|
25-27 Sutter St. (2006)
|
Two story plus basement bar/ office UMB seismic & major renovations. New roof, restrooms & HVAC. |
Cranwest Exchange Walter Seput (541) 891-0020 |
|
2485 Mission St. |
2 story commercial UMB seismic retrofit. |
Sami Nazzal (415) 661-2585 |
|
517 Broadway (2005) |
3 story Mixed use restaurant UMB seismic retrofit. |
Wellat Yuksel (650) 579-1189 |
|
956 Mission St. (2005) |
3 story commercial UMB seismic retrofit & handicap Construction 4 steel frames, new roof diaphragm, several steel braces. |
Ben Lee (415) 609-8239 |
|
400 Valencia St. (2006) |
2 story plus basement mixed use UMB seismic retrofit. |
Kuan Khuu (415) 517-6358 |
|
Presidio Golf Club 8 Presidio Terrace. (2005) |
Design/build Club House handicap access provisions. |
Jeffrey Yee (415) 221- 8833 |
|
1691-1697 Mcallister. (2005) |
Design/build 3 story Residential units foundation anchors and shear walls. |
Coastal Capital Kyle Jeffers (415) 339-3160 |
|
701 Grant/800 Sacramento Bank of America building |
3 story Bank of America, restaurant and Buddhist Temple UMB Building in Chinatown San Francisco. |
Simon Lau (415) 819-0891 |
|
401 Eddy St. (2004) |
3 story basement mix use unreinforced brick building seismic retrofit.. |
Mrs. Karen Trinh (415) 467-3127 |
|
721 Filbert St. (2004) |
Installation of a new handicap lift chair, ramp and electrical system. |
John Zellerback BE Properties (415) 986-1352 |
|
364 Bust St. (2003)
|
2 story with basement office/restaurant UMB seismic retrofit. |
Nick Tousant/ Gene Dale Callan, Stroud & Dale (415) 981-2000 |
|
1222 Sutter St. (2000) |
2 story with basement commercial brick building |
Michael Ching (415) 346-8181 |
|
1151 Stockton St. (2000) |
2 story with basement mix use brick building. |
John Sing Yuen (916) 443-9285 |
|
83 Minna St. (2005) |
1 story UMB restaurant seismic retrofit. |
Jim Patrick (415) 392-2640 |
|
90 Natoma St. (2007) |
UMB parking garage seismic retrofit. |
Jim Patrick (415) 392-2640 |
|
554 Market/ 22 Sutter St. (2006) |
2 story commercial UMB seismic retrofit. |
Vic Santana (925) 827-0841 |
SOUTH SAN FRANCISCO |
|
|
164-168 Marco Way.(2006) |
Seismic retrofit of 1 story tilt up building. |
Tom Keane, ATC Partners, (415) 951-0500 |
SAN RAFAEL |
|
|
910 Lincoln Ave.(2005) |
2 story brick building seismic retrofit & tenant improvements. |
Tom Tacchi (415) 453-1763 |
SAUSALITO |
|
|
1-15 Princess Street.(2007) |
Seismic retrofit of 2 story UMB Historic Building. |
Mike Monsef Monsef Enterprises (415) 289-0373 |
WALNUT CREEK |
|
|
|
1851 Trinity Ave. Walnut Creek (2000) |
Soft-Story 46 unit residential apartment voluntary seismic retrofit. |
Joe Janlois (925) 820-6969 |